Commercial Electric Contractor

Community Bank

  • Located at 1288 SE Commercial Dr, College Place, WA 99324
  • New construction wiring project
  • 21,507 sq ft, three story bank serving the entire Walla Walla valley
  • Year long project

General Hospital Expansion Project

  • Located at 1025 S 2nd Ave, Walla Walla, WA 99362
  • Mixed new and remodel construction expansion wiring project
  • 35,000 sq ft expansion project
  • Included two 500 KW Caterpillar diesel generators wired with automated paralleling swich gear

Sterling Savings Bank

  • Located at 680 W Rose St, Walla Walla, WA 99362
  • New construction wiring project

Walla Walla University Soccer Field

  • Located at the far end of SW 4th Street in College Place, WA
  • Electrical project total $200,000
  • We assembled the poles, wired and installed the lights and lifted them into place with our own 10-ton crane truck
  • Lights were engineered by Building Gods Way to focus light on the soccer field with minimal spill outside the track and no light shining towards the houses across the street
  • Each pole is 80’ tall (70’ above ground and 10’ below ground) and produces 24.4kW of power

Holiday Inn Express Solar Panel Project

  • Located at the corner of Myra Rd & Pine St
  • Solar Panels were engineered and installed by Texas Green Energy
  • The System is 94.5kW and estimated to make 118,000kWH per year on average
  • Hays Electric, LLC provided all infrastructure wiring and design